Project
Eco Electric successfully managed the electrical system upgrade for CA BOTANA INTERNATIONAL INC., a prominent skincare manufacturer based in San Diego. This project involved transitioning their operations from a 35,000 sqft to a more efficient 25,000 sqft warehouse. Key aspects included designing and installing three-phase panels, circuits, and custom lighting solutions for enhanced functionality and aesthetics in the front desk area and lobby. The upgraded infrastructure supports CA BOTANA’s manufacturing and distribution operations, ensuring optimal efficiency and client satisfaction.
Challenges
- Warehouse Size Reduction: Adapted electrical systems from a 35,000 sqft to a 25,000 sqft warehouse, ensuring optimal distribution and efficiency.
- Engineering Complexity: Managed in-house planning and engineering for electric circuits and three-phase panels to accommodate diverse operational needs.
- Custom Lighting: Designed and installed custom lighting solutions for the front desk area and lobby, enhancing aesthetics and functionality.
Results
- Enhanced Efficiency: Upgraded electrical infrastructure facilitated smooth relocation and operation in the new 25,000 sqft warehouse, optimizing energy usage.
- Improved Workspace: Implemented warehouse-wide lighting enhancements, ensuring adequate illumination for all operational areas.
- Customer Satisfaction: CA BOTANA INTERNATIONAL INC. now benefits from a tailored electrical setup that supports their manufacturing and distribution operations effectively
Business
- CA BOTANA INTERNATIONAL INC. is a leading skincare manufacturing company based in San Diego, renowned for brands like Doctor D. Schwab, Sea Enzyme, and Ambrosia Aromatherapy.
- Mission: Dedicated to producing high-quality skincare products using innovative and sustainable practices.
- Collaboration: Eco Electric collaborated closely with CA BOTANA INTERNATIONAL INC. to provide comprehensive electrical solutions, aligning with their commitment to excellence and efficiency in skincare manufacturing.