Proeject
Puma Factory Outlet 12,000sqft Dual Suite Remodel at Las Americas Mall.
Challenges
- High Ceiling Installation: Maneuvering lifts to work effectively with the 25-foot-high ceilings during installation.
- Transformer Installation: Mounting two 45KVA wall-hung transformers, each weighing 400 pounds, at an elevated height of 18 feet on a wall.
Results
- Emergency Resolution: Responded to a critical service call due to smoke from a 480v transformer at San Ysidro mall, swiftly resolving the issue after hours to ensure uninterrupted work for the demolition crew.
- Project Award: Secured the contract for the 12,000 sq ft dual suite remodel at Puma Factory Outlet, demonstrating reliability and technical expertise.
Business
- Puma Factory Outlet
- Location: Situated within Las Americas Mall, a bustling retail destination in San Diego.
- Purpose: The remodel aimed to enhance the retail space, aligning with Puma’s brand image and customer experience goals.
- Collaboration: Eco Electric worked closely with mall management and contractors to execute the remodel efficiently, meeting stringent safety and operational standards.