#ContractorCollaboration Archives - Eco Electric San Diego https://www.ecoelectricsandiego.com/tag/contractorcollaboration/ Full Service Residential & Commercial Electrical Contractor San Diego Mon, 24 Jun 2024 20:31:07 +0000 en-US hourly 1 https://wordpress.org/?v=6.7 Puma Los Americas https://www.ecoelectricsandiego.com/puma-los-americas/ Sat, 10 Feb 2024 22:25:24 +0000 https://www.ecoelectricsandiego.com/?p=2328 Puma Factory Outlet 12,000sqft Dual Suite Remodel at Las Americas Mall.

The post Puma Los Americas appeared first on Eco Electric San Diego.

]]>

Proeject

Puma Factory Outlet 12,000sqft Dual Suite Remodel at Las Americas Mall.

Challenges

  • High Ceiling Installation: Maneuvering lifts to work effectively with the 25-foot-high ceilings during installation.
  • Transformer Installation: Mounting two 45KVA wall-hung transformers, each weighing 400 pounds, at an elevated height of 18 feet on a wall.

Results

  • Emergency Resolution: Responded to a critical service call due to smoke from a 480v transformer at San Ysidro mall, swiftly resolving the issue after hours to ensure uninterrupted work for the demolition crew.
  • Project Award: Secured the contract for the 12,000 sq ft dual suite remodel at Puma Factory Outlet, demonstrating reliability and technical expertise.

Business

  • Puma Factory Outlet
  • Location: Situated within Las Americas Mall, a bustling retail destination in San Diego.
  • Purpose: The remodel aimed to enhance the retail space, aligning with Puma’s brand image and customer experience goals.
  • Collaboration: Eco Electric worked closely with mall management and contractors to execute the remodel efficiently, meeting stringent safety and operational standards.

The post Puma Los Americas appeared first on Eco Electric San Diego.

]]>